High Speed Diesel
storage and pumping stations at Port Qasim, Shikarpur
and Mahmood Kot. |
 |
By-pass facilities
for future pumping stations at Bubak and Fazilpur. |
 |
1800
HP Motor-driven mainline pumps 4 each at Port Qasim
and Shikarpur stations; additional pumps to be installed
at Bubak and Fazilpur stations in second phase. |
 |
30”
unloading line from Fauji Oil Terminal to PAPCO
Station at Port Qasim. |
 |
817 kms, 26” pipeline from Port Qasim to Mahmood Kot, with links to Karachi Port via PARCO’s Korangi Pumping Station. |
 |
Additional
Storage Facility of 222,000 tons of HSD at Port Qasim,
Shikarpur and Mahmood Kot. About the same quantity is
also held in the pipeline which can be accessed in case
of national emergencies. |
 |
Fiber
Optic Cable based communication system with a Microwave
back-up system available. |
 |
Fiber Optic Cable based State-of-the-art Telecom and
Supervisory Control And Data Acquisition (SCADA) system
to ensure that pressure in the line remains within the
safe operating parameters at all times. |
 |
Emergency
Shut Down (ESD) system for overall protection of the
system. |
 |
Estimated
annual freight savings will be around Rs.8.0 billion
/ year, over a period of 20 to 25 years. |
 |
By
linking Port Qasim with KPT’s oil handling facilities
as well as PARCO’s existing 1250 km cross-country
pipeline network, WOPP has tremendously increased the
operational flexibility and strategic value of the country’s
oil logistics. |