> WHITE OIL PIPELINE SYSTEM > KEY
PROJECT INFORMATION |
 |
| |
| EPC Agreement Signed |
August 7, 2001 |
| EPC Contractor |
China Petroleum Engineering & Construction Corporation – Techno (Pvt) Ltd. Consortium |
| Project Duration |
23 months |
| Design Endorsement by |
PENSPEN, UK |
| Pipeline Route/Length |
Karachi to Mahmoodkot – 817 kms |
| Pipeline Size |
26” diameter telescopic |
| Pipeline Capacity |
Up to 12 million tons/year, can be increased to 18 million tons / year if required, to cater to the requirements for the next 30-40 years |
| Primary Thruput |
High Speed Diesel Oil (HSD) |
| Korangi – Port Qasim Link Pipeline (KPLP) |
The 22-kilometer long, 26" dia was commissioned in March, 2006. It offers flexibility by connecting both, Port Qasim and Keamari ports together. |
|
| |
|
 |

|